FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  GE MDS, LLC

Address
Attention: Ron Evans
Street Address: 175 Science Parkway
P.O. Box:
City: Rochester
State: NY
Zip Code: 14620
Country:
E-Mail Address: ron.evans@ge.com

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Evans
First Name: Ron
Title: Lead Project Network Engineer
Phone Number: 201-832-7279

Explanation
Please explain in the area below why an STA is necessary:
The STA is necessary to show the capabilities of the GE Vernova Private LTE Base Station product for industrial wireless customers, operating at the Orlando Hyatt, Conference Room L, as part of GE Vernovas presence at DitribuTech International 2024 at the Orange County Convention Center from 02/25/2024 to 02/29/2024, which is quickly approaching.

Purpose of Operation
Please explain the purpose of operation:  Show the capabilities of the GE Vernova Private LTE Base Station product for industrial wireless customers, operating at the Orlando Hyattat DitribuTech International 2024. The purpose will be to showcase use case suitability, testing, and functionality of the product utilizing current GE wireless routers as UEs. Testing will include Grid Utility customer presentations including Emergency Services notifications and services over the PLTE network. This will include communication for Police, Fire, and Public Safety including GE's Push to Talk (PTT) options. The Emergency Services portion is very important and an essential piece of the operation at the Hyatt next door to the convention center.

Information
Callsign: WN2XBV
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 02/25/2024
Operation End Date: 02/29/2024

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Lifelink Wireless Extense-N 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Ronald Evans
Title of Applicant (if any): Lead Engineer
Date: 2024-02-09 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Orlando Florida North  28  25  39 West  81  57  49 0.03
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Antenna and Base station will be indoor at The Hyatt Regency Conference Room L
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 896.00000000-901.00000000 MHz FX 0.100000 uW 0.100000 mW P 0.00020000 % 3M00W3N 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 935.00000000-940.00000000 MHz FX 0.100000 mW 0.100000 mW P 0.00020000 % 3M00W7N 64QAM