FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  The Boeing Company

Address
Attention: Global Spectrum Management - Daniel McNeil
Street Address: 5300 International Blvd M/C 7817-2202
P.O. Box:
City: North Charleston
State: SC
Zip Code: 29418
Country:
E-Mail Address: daniel.p.mcneil@boeing.com

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: MCNEIL
First Name: DANIEL
Title: Frequency Manager
Phone Number: 714-642-7485

Explanation
Please explain in the area below why an STA is necessary:
This STA is necessary for command, tracking, and analysis of the Boeing CST-100 Crew Capsule Orbital Flight Test 2 (OFT-2) mission to the International Space Station. OFT-2 will be Boeings second Orbital Flight Test mission. On OFT-1, which launched in December 2019, Starliner suffered multiple issues, and was not able to meet up with the International Space Station and landed after circling Earth solo for three days. The OFT-2 will repeat all of the same test objectives. The following attached flight timeline was based on the previous launch date of July 7th 2021 and represents Boeing’s current flight plan for its May 20th 2022 attempt. The docking duration is based on both test objectives and vehicle consumables, and is currently planned to be 3 to 5 days. Boeing/NASA will assess an needs to extend the duration of this mission based on weather or safety concerns. The program has assigned White Sands Space Harbor (WSSH) as the primary landing site, and Dugway as a backup site. Space to Ground Communications Concept of Operations: The S/G communications segment consists of the communications links between the CST-100 and TDRSS. Mission Planning is responsible for determining when communication coverage is possible, based upon CST-100 trajectory and orientation, and determining desired communication contact periods. TDRSS will be the primary communications link to the CST-100 throughout most of the mission (where ever there is positive link margin). The S/G communication links are full duplex data links providing digital voice, low rate imagery, telemetry and command and control capability. The CST-100 automated antenna management software, implemented within the Systems Management flight software, will be used to autonomously select the optimal S/G transmit/receive antenna pair based on the vehicle’s attitude, the target state vector, antenna radiation patterns, and TDRSS or ground station communications coverage schedule. The S/G communications system will be powered off approximately 1 hour after landing. Space to Space Communications Concept of Operations The S/S communications segment consists of the direct communications links between the CST-100 and the ISS for rendezvous, docking and undocking mission phases. The S/S communications segment provides full duplex data transfers and digital voice at the appropriate data rates when within communication range of the ISS. The direct communications links allow the CST-100 to navigate within the control sphere surrounding the ISS while maintaining positive control and a safe environment for both spacecraft. For ISS missions, the CST-100 will communicate with the ISS through the NASA Common Communications for Visiting Vehicles (C2V2) system and can be used a “bent pipe” relay for vehicle telemetry from the CST-100 to the MCC-CST. Included are two files labeled mcCycle_0001.out, the of which covers the vehicle trajectory from launch to docking, whereas the smaller file covers undocking to landing. The three file is the PFD/PSD analysis for the two communications systems.

Purpose of Operation
Please explain the purpose of operation:  Communication with CST-100 Crew Capsule during OFT-2 mission

Information
Callsign:
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 04/01/2022
Operation End Date: 10/01/2022

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
General Dynamics 01-0043-0002 1 No
Delta Microwave Inc DM-HPS-50-102-S 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Daniel McNeil
Title of Applicant (if any): Spectrum Manager
Date: 2022-02-09 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Cape Canaveral Florida North  28  35  0 West  80  34  58 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2203.20000000- MHz FX 7.940000 W 26.120000 W M 6M16D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2287.50000000- MHz MO 12.300000 W 208.450000 W M 6M16D7W

City State Latitude Longitude Mobile Radius of Operation
Space station Other North      West      NONGEOSTATIONARY, SP
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2203.20000000- MHz MO 7.940000 W 26.120000 W M 6M16D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2287.50000000- MHz MO 12.300000 W 208.450000 W M 6M16D7W